SWD Solutions for Al-Salaam Pump Station (UP03-PS):

Construction of Al-Salaam pump station in Jeddah that collects the rain water from the storm water drainage shafts in package UP03 and pumps and discharges the water into the adjacent Red Sea. It comprises of:

Inlet and Pump Shafts, Deep Pump Shaft – Drain Pumps  Tunnel from Inlet Shaft to the Pump Shaft, Pump Basin,  Discharge Channels, Overflow Channels, Two Test lines to Shaft 11, Office & Administration Building, Workshop Building, Storage Building, Generator Building, MCC & Control Building, MV Building, Guardroom, Fire Water Tanks, and Irrigation Water Tank

Main Stormwater Drainage Line from AlKhalij Lake to Wadi Rumma in Buraydah, Qasssim Region:

Construction of the Main Stormwater Network for the city of Buraydah, including Tunnelling (11.2 KM of 3500 mm Dia., and 1.9 KM of 2500mm Dia., Tunning Works), Deep Shafts constructions, Deep Excavation for Pipe Installation, and Stormwater Pump Station to lift the stormwater and rain water.

Strom Water Projects - Continued

Stormwater Drainage Solutions for Al-Manar District in Jeddah:

Construction of Storm Water Drainage Networks for ALMANAR DISTRICT NF5&9 PROJECT in the city of Jeddah including the construction of Storm Water Drainage Pipelines, Inlets, Manholes, Deep Excavations, Shafts, Tunneling and related works as per the contract specifications.

 

 

 

 

 

 

 

 

Stormwater Drainage Solutions for the Globe Roundabout in Jeddah:

Construction of Storm Water Drainage Networks for the Globe Roundabout area north Jeddah including the construction of Storm Water Drainage Pipelines, Inlets, Deep Shafts, Tunneling, Manholes, and Sea Outfall.